How to manage construction plant
The term ‘plant’ refers to machinery, equipment or apparatus used for an industrial activity. Typically, in construction, ‘plant’ refers to heavy machinery and equipment used during construction works. Many construction companies fail to manage plant efficiently, despite the fact that it represents one of their biggest costs.
Construction plant is generally re-useable, and so, as well as being purchased new, it may be purchased second hand or hired. Rented vehicles tend to be newer, and so better maintained, more reliable, and equipped with more up-to-date features. By renting plant, companies are also able to scale their fleet size up or down relatively flexibly.
For more information, see Plant acquisition.
Accounting software for construction management often features plant management modules. This can enable plant to be assigned efficiently, by listing plant and their relevant details, including availability. Relevant staff are then able to determine the availability of plant at any given time. This is particularly useful for larger companies who may have several projects in progress simultaneously and need to be able to maximise their fleet’s utility.
By using such software to manage plant, it is also possible to monitor variable and fixed costs associated with insurance, storage, operation and depreciation.The actual costs of each contract can be easier to understand if plant costs are automatically associated with the relevant works in the accounts system. Rising costs are also easier to detect and monitor, and can help a company make informed decisions about managing the fleet, i.e. replacing an older vehicle that has had large repair bills.
Maintaining plant effectively and safely is a legal requirement, but it is also beneficial in terms of reducing costs. Management of plant involves identifying hazards for each item and having a plan for how they can be avoided through maintenance and regular inspections.
Accounting software can assist with highlighting the most appropriate time, i.e. during downtime, that an item of plant could undergo maintenance. This is useful in terms of forward planning projects that may need to use the item on-site, and scheduling specialist contractors that may be required for maintenance purposes.
Increasingly, construction companies have been exploring the opportunities of the Internet of Things (IoT) for plant management. For example, Caterpillar have begun manufacturing plant items with sensors and other connected devices, with the aim of establishing completely digitised and data-driven fleets.
Some of the plant management benefits of using IoT include:
- Accurate measurement of engine load, fluid temperature and pressure, idle time, fuel consumption, etc.
- Identifying operators who may be using plant incorrectly and require retraining, e.g. using excessive fuel.
- Generating data relating to machine performance and efficiency, allowing managers to reduce energy consumption and increase productivity.
- Giving a more accurate picture of when and how plant is used..
- Better predictability of when the plant is likely to require maintenance.
- Plant performance can be tracked in real time, highlighting areas not running to their full capacity.
- Plant can be tracked, helping to prevent theft and misuse.
- Alerts relating to the location of plant can be sent to workers on-site, improving their awareness and so safety.
- Automatic ordering of replacement parts as and when required.
- Accurate monitoring of site noise and vibration compliance.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Activity schedule.
- Construction inventory management.
- Construction plant.
- Construction tools.
- Contractor’s master programme.
- Internet of things.
- Logistics management.
- Material handling.
- Planned preventive maintenance.
- Plant acquisition.
- Programme for building design and construction.
- Project manager.
- Resource management.
- Scheduling construction activities.
- Time management of construction projects.
- Wheel washing system.
Featured articles and news
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.